Bell and U.S. Army Advance V-280 Valor Development and Aviation Modernization
Bell Textron Inc. and the U.S. Army have agreed to terms on the execution of the second phase of the Competitive Demonstration and Risk Reduction (CD&RR) contract that was awarded in March 2020 for the Future Long-Range Assault Aircraft (FLRAA) program. This new contract is an important milestone and testament to the continued momentum for Army modernization. Bell’s flight-proven V-280 Valor design advances from an aircraft with transformational speed and survivability towards a low-risk weapons system ready to support joint combined arms and maneuver operations around the world.
During phase one of the CD&RR, Bell provided detailed iterations on the V-280 design, data to highlight the feasibility of executing the program of record requirements, and executed trade studies using model-based systems engineering. This work will continue under phase two as the Army finalizes requirements for the program of record planned for 2022.
Bell has already safely delivered groundbreaking performance and successfully completed a rapid design, build, and test program with the V-280. Since its first flight in 2017, the V-280 team has executed a rigorous flight test program flying more than 200 hours through over 160 individual test flights that delivered critical data to validate Bell’s digital models and performance.
As the FLRAA competition moves to a program of record, Bell continues to take a holistic approach to transition the V-280 to a weapons system that ensures exceptional performance and is affordable throughout the lifecycle. From the outset, the Bell V-280 Valor was designed for efficiency—using simplified and inherently reliable designs, adhering to Army Modular Open Systems Approach (MOSA) requirements, reducing maintenance costs, and increasing reliability. Bell applied digital design and manufacturing technologies, included maintenance as part of the design process, and used emerging commercial processes to bring a comprehensive view of digital models, processing, and analysis. This methodology has reduced programmatic risk, improved lifecycle maintenance and servicing outcomes, increasing program affordability.
Top Stories
INSIDERManned Systems
Turkey's KAAN Combat Aircraft Completes First Flight - Mobility Engineering...
INSIDERMaterials
FAA Expands Boeing 737 Investigation to Manufacturing and Production Lines -...
INSIDERImaging
New Video Card Enables Supersonic Vision System for NASA's X-59 Demonstrator -...
INSIDERManned Systems
Stratolaunch Approaches Hypersonic Speed in First Powered TA-1 Test Flight -...
INSIDERUnmanned Systems
Army Ends Future Attack and Reconnaissance Helicopter Development Program -...
ArticlesEnergy
Can Solid-State Batteries Commercialize by 2030? - Mobility Engineering...
Webcasts
AR/AI
From Data to Decision: How AI Enhances Warfighter Readiness
Energy
April Battery & Electrification Summit
Manufacturing & Prototyping
Tech Update: 3D Printing for Transportation in 2024
Test & Measurement
Building an Automotive EMC Test Plan
Manufacturing & Prototyping
The Moon and Beyond from a Thermal Perspective
Software
Mastering Software Complexity in Automotive: Is Release Possible...